7 Ton Overhead Crane
Compared with the traditional crane in China, the main difference is the use of better quality parts, and the 7 ton overhead crane european type wheel group is the key part of such parts. European wheel group with light weight, small size, easy to install, mainly by the wheel shaft, wheel plate, bearing box, bearing four parts, and three-in-one reducer directly match, do not need to be connected through the coupling, so this kind of wheel structure compact, high assembly accuracy, smooth operation and low noise.
- Fast Delievery
- Quality Assurance
- 24/7 Customer Service
Product Introduction
1. Product Introduction of 7 ton overhead crane european type:
Compared with the traditional crane in China, the main difference is the use of better quality parts, and the 7 ton overhead crane european type wheel group is the key part of such parts. European wheel group with light weight, small size, easy to install, mainly by the wheel shaft, wheel plate, bearing box, bearing four parts, and three-in-one reducer directly match, do not need to be connected through the coupling, so this kind of wheel structure compact, high assembly accuracy, smooth operation and low noise.
7 ton overhead crane european type is based on the European lightweight and modular design concept and advanced production and manufacturing process, hanging electric hoist lifting mechanism on the main beam, can be left and right, up and down, front and back to achieve material objects in three-dimensional space handling. The product is advanced in technology, designed in accordance with international standards: DIN (Germany), FEM (Europe), ISO (International), with strong rigidity, light weight, excellent structural design and other advantages, can effectively save plant space and investment costs, unique characteristics of walking structure, is your best choice.

2. Parameters 7 ton overhead crane european type:
| Lifting Weight(t) |
1 |
2 |
3 |
5 |
10 |
20 |
Customized |
||||||||||||||||||
|
Span(m) |
7.5 |
10 |
15 |
18 |
8 |
13 |
18 |
27 |
7.5 |
12 |
18 |
23 |
8 |
12 |
15 |
18 |
8 |
12 |
15 |
20 |
10 |
16 |
19 |
26 |
Customized |
|
Working Speed |
Customized |
||||||||||||||||||||||||
|
Model of Electric Hoist |
Electric European Wire Rope Hoist Trolley |
||||||||||||||||||||||||
|
Lifting Speed(m/min) |
Customized |
||||||||||||||||||||||||
|
Hoisting Height(m) |
Customized |
||||||||||||||||||||||||
|
Working Class |
A5-A6 |
||||||||||||||||||||||||
|
Electric Current |
Three-phase AC 380V 50Hz or Customized |
||||||||||||||||||||||||
3. Component:
7 ton overhead crane european type is composed of main girder, end girder, hoisting mechanism, traveling mechanism, electrical and so on.
The main beam and end beam are welded box beam structures, and the lower flange plate is used as the running track of the European Wire Rope Hoist Trolley, the main beam and the end beam are connected by high-strength bolts, which are convenient for transportation and on-site installation.
The electrical connection adopts the international standard heavy-duty aviation plug, the protection level is IP65, and has the characteristics of fast plugging and unplugging, and reliable connection.
4. Crane lubrication
The quality of crane equipment lubrication directly affects the normal operation of each mechanism, and is closely related to extending the life of the machine and safe production. Therefore, use and maintenance personnel must carefully check the lubrication conditions of each lubrication point, and promptly replenish and replace lubricating grease according to regulations.
The lubrication of cranes with small and medium lifting capacity is mostly done by using oil guns to refuel at the lubrication points. Large-tonnage cranes often use centralized lubrication. The oil pipes are concentrated in one place and each lubrication point is regularly refueled with an electric pump.
5. Lifting wire rope replacement steps and precautions
1. Take a trolley to the front end of the boom and clamp the lifting wire rope and trolley rope with buckles (also called U-shaped buckles) (50 cm away from the trolley), then loosen all the buckles of the lifting wire rope, and retract the trolley to the crane. The hook falls on the introduction platform and loosens the buckle blocking the lifting wire rope and trolley rope.
2. Loosen the lifting limit, collect the wire rope to the balance arm, lift the new wire rope from the gap of the winch and tie it, let go of the old wire rope, install the new wire rope and arrange the wire rope.
3. Thread the wire rope from the tower cap, into the trolley wheel, into the hook and then into the trolley wheel. At a distance of 50 cm from the trolley, fasten the trolley wire rope and the lifting wire rope with a buckle (leave 1-2 meters for the lifting wire rope) ) The trolley goes to the front end of the boom, threads the wire rope and fastens it with buckles, loosens the buckles blocking the trolley rope and the main rope, and restores the lifting limit. can save on your electricity bills while still being able to handle heavy loads. Our hoist motors have a low energy consumption feature, meaning they can cut down energy consumption by up to 30%.
6. Why choose us?
Modern production workshop & equipment.
Professional overseas installation & training team.
We can offer customized service to meet your needs.
We are confident in the quality of our products, and we invite you to contact us today to learn more about how our crane system can benefit your business.
Hot Tags: 7 ton overhead crane, China 7 ton overhead crane suppliers, manufacturers, factory








