Instructions For Crane Summer Open-Air Operation

Jul 03, 2023

Instructions for Crane Summer Open-Air Operation
 

Cranes need to pay special attention to safety issues when operating in the open air, especially in summer, and pay special attention to the following points when cranes are operating in the open air in summer:
 

50 ton gantry crane

 

1. It is rainy in summer, and the electrical equipment of cranes operating in the open air in summer should be equipped with rain covers.
 

2. When the 15 ton gantry crane is operating in the open air in summer, if there is a thunderstorm, the operation must be stopped. If there is no time to take precautions, the driver should stay in the machine room;
 

After lightning: Before use, carefully check the place where the crane was hit and the place where lightning passed:
 

Hook-Overhead-Crane

 

3. The crane should be equipped with a wind speed alarm when working in the open air in summer. When the wind force is greater than the allowable wind pressure, it can send out an alarm signal and have the ability to display the instantaneous wind speed; when the wind force is greater than level 7, it must stop working and start the crane. Go to the designated place and take corresponding safety measures.
 

4. On the track, when the crane is operating in the open air in summer, its rail clamps, anchoring devices or iron shoes should be able to independently withstand the maximum wind force in the non-working state, or they will not be blown by the wind and cause accidents.
 

Overhead Lifting Crane 5 ton

 

5. When the crane is operating in the open air in summer, the driver's cab must be protected from rain, wind, and sunlight, and an effective heat insulation layer should be provided. The window glass exposed to heat radiation should be tempered glass, and ventilation and cooling devices should be installed indoors.
 

6. When the 15 ton goliath crane is working in the open air in summer, it should be ensured that the crane is working on a flat ground. If the ground is uneven, sleepers or other backing boards can be laid, and it is not allowed to work on a slope or lift heavy objects. , the range is larger than that of land increase.