What Are The Inspection And Evaluation Of Lifting And Hoisting?
Jun 27, 2023
What are the Inspection and Evaluation of Lifting and Hoisting?

1. Lifting
① When multiple 15 ton overhead cranes lift a component at the same time, the load borne by a single crane should meet the requirements of the special construction plan;
② The hanging point of the sling should meet the requirements of the special construction plan;
③ When the crane is operating, no one should stay under the boom, and the suspended objects should not pass directly above the person;
④ Cranes should not use spreaders to carry people;
⑤ When lifting easily scattered objects, special hoisting cages should be used.

2. Working at heights
① The high-altitude operation platform should be set up according to the regulations;
② The strength of the platform and the height of the guardrail should meet the specification requirements;
③ The strength and structure of the ladder should meet the specification requirements;
④ Reliable seat belt suspension points should be set up, and should be used for high hanging and low hanging.

3. Component stacking
① The stacking load of components should be within the allowable range of the bearing capacity of the working surface;
② The stacking height of components should be within the specified allowable range;
③ There should be measures to ensure stability in the stacking of large components.

4. Vigilant supervision
① Operation alert areas should be set up in accordance with regulations;
② Special personnel should be set up to guard the warning area.