15 Ton Suspension Double Beam Bridge Crane with European Hoist Trolley
video
15 Ton Suspension Double Beam Bridge Crane with European Hoist Trolley

15 Ton Suspension Double Beam Bridge Crane with European Hoist Trolley

15 ton Suspension Double Beam Bridge Crane with European Hoist Trolley is mainly used for the transportation of large and heavy work pieces on the assembly line. The Suspension Double Girder Overhead Crane is mainly composed of: main beam, end beam, trolley (Electric European Wire Rope Hoist), hook and guide rails, etc.

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

1. Product Introduction:

15 ton Suspension Double Beam Bridge Crane with European Hoist Trolley is mainly used for the transportation of large and heavy work pieces on the assembly line. The Suspension Double Girder Overhead Crane is mainly composed of: main beam, end beam, trolley (Electric European Wire Rope Hoist), hook and guide rails, etc.

Among them, the whole overhead crane reciprocates longitudinally along the longitudinally installed track, while the trolley installed under the main girder reciprocates laterally along the horizontally installed track above the main girder, and the hook realizes the vertical lifting and lowering of the work piece. The working area is a rectangle. The working class can reach: A5-A6.


ton Double Beam Bridge Crane

2. Parameters:

Lifting Weight(t)

2

4

5

10

16

Customized

Span(m)

Customized

Model of Electric Hoist

Electric European Wire Rope Hoist Trolley

Working Class

A5-A6


3. Component: 


European Suspension Bridge Crane consists of main girder, suspension end beam, cart running mechanism, trolley running mechanism, etc.; the double beam spans the entire workshop and is connected to the end car by bolts and welding. Tracks are installed under the double beams, so that the trolley can walk horizontally below, while the end trolley walks longitudinally, and the trolley walks horizontally.

The fixed European Wire Rope Hoist is used as the hoisting mechanism. It is installed on the centrally driven double-track trolley and used in conjunction with the double-girder bridge.


4. Applicable Environment:

Relatively speaking, it is designed for lighter loads (no more than 2000kg), such as: parts assembly, manufacturing and processing industry, palletizing, injection molding, warehousing loading and unloading, equipment repair and maintenance:


The European Suspension Double Beam Bridge Crane is a perfect choice when a work area does not allow for any supporting structures in order not to interfere with operations.


The crane system required a roof structure that was strong enough to safely support the crane's load. Customers can install multiple main beams on a set of fixed rails, which greatly improves production efficiency.

ton Bridge Crane

5. Wearing Parts:

Rope guides, travel limiters, buffers, and brake rings.


6. How to install European electric wire rope hoist?

(1) Installation of the main beam suspension ring. This kind of installation can play a stabilizing role, and the main material used is the lifting ring. We need to determine the number of lifting rings according to the structure of the gourd. Generally speaking, four sets or two sets are common. If there are four sets, they must be installed on the main beam, which plays a fixed role.


(2) When installing the hoist, keep the object to be installed and the object to be installed on the same level.


(3) When the wire hoist is in use, it needs a manual/electric trolley, sometimes four are installed, and it must be fixed on the driving shaft.


(4) Built-in buffer. The buffer is an indispensable and important speed adjustment device during the use of the wire rope electric hoist. Generally, the built-in buffer is installed on the main beam of the hoist.


(5) Keep your distance. After the hoist is installed on the main beam ring, it is still necessary to achieve reasonable control in the distance.


7. Frequently Asked Questions


Q: How do you ensure your product quality?
A: All our processes strictly adhere to ISO-9001 procedures, which include Material Traceability, ISO WPQR and welder certificate, Measuring Device Calibration, NDT for the welding, and full assembling and load testing before deliver


Q: What's the Product Time for Overhead Crane or Gantry Crane?

A: Generally 20~30 days. If your order is urgent, that can be shorten accordingly.


Q: Which standard of your crane and crane components apply to?

A: Our Crane can design and manufacture base on FEM, CMAA, ISO EN, GB standard.


Q: How can I make payment?

A: We accept T/T bank transfer, L/C, Paypal.

For regular clients, we could provide more supportive payment term.


Hot Tags: 15 ton suspension double beam bridge crane with european hoist trolley, European Suspension Bridge Crane, Suspension Double Beam Bridge Crane, China 15 ton suspension double beam bridge crane with european hoist trolley suppliers, manufacturers, factory

You Might Also Like

(0/10)

clearall