How To Install A European Crane?

Sep 02, 2023

How to install a European Crane?

 

European standard bridge cranes are much lighter in weight than traditional cranes and have high transmission efficiency. European standard bridge cranes omit many of the above-mentioned transmission components and use materials with better performance to manufacture key components, which greatly reduces the volume and weight of each device, thereby also reducing the burden of the entire machine. The main load-bearing components can Naturally reduces cross-section and weight.

 

bridge crane hoist

 

Users who have used domestic traditional cranes and European standard overhead cranes may find that the motor power of each arrangement of European standard overhead cranes is smaller than that of traditional cranes of the same tonnage and span. Although the European standard bridge crane has low power, it does not affect the operation.

 

10-Ton-Overhead-Crane-Equipment

 

European-style crane electric hoists are generally installed together with the main beam. Different from traditional bridge cranes, the electric hoist is not hung under the main beam. In particular, it is difficult to install the electric hoist on the main beam. If a truck crane is used alone, it will be difficult to install an electric hoist. The difficulty in installation is that the center line, European crane lifting point line and main beam center line are all in the same vertical plane. It is almost impossible for a truck crane to send the electric hoist to the required position, so there is a certain degree of difficulty in the installation process.

 

When the electric hoist is installed alone, our company recommends using two hoists to lift from both sides of the main beam. Two slings can be used to form two lifting points around the main beam. Hang the hoist on the two lifting points, and then lift the electric hoist. Since the two hoists are hoisted together, attention should be paid to the balance of the electric hoist during the hoisting process. After lifting to the required height, equipment and fixing can be carried out.

 

european-wire-rope-hoist-15-ton

 

However, some cranes have small girder sizes, especially European-style cranes. For example, the main beam height of a 5-ton 9-meter European single-girder crane is about 600mm. At this time, if you adopt the above method, it will not be possible to increase the distance. The solution is to find a suitable lifting point from outside the lifting equipment. Drilling holes are usually made in steel beams in workshops (steel structures workshops). If it is a concrete beam, car cranes and scaffolding can also be used as lifting points. In short, a point that can bear the weight of the electric hoist and meet the equipment requirements should be selected as the lifting point.