Double Girder Overhead Crane To Algeria

Dec 24, 2024

Good news! An Algerian client purchased a double-girder overhead crane from Dejun Industrial for their factory. Their factory needs a lifting machine to carry heavy objects and meet production needs. Through a comprehensive understanding of lifting cranes and Dejun Company, the Algerian client decided to sign a cooperation relationship with us. We are a well-known manufacturer and exporter of crane machines in China. We mainly produce gantry cranes, overhead cranes, jib cranes, etc. Various kinds of lifting cranes are available. They purchased a 15-ton top-running double-girder overhead crane and lifting machine spare parts this time. Before ordering, they visit our factory and overhead crane production lines in person. Our factory is located in Xinxiang City, Henan Province. If you have a plan to purchase a lifting machine, please do not hesitate to contact us. We will recommend a suitable machine depending on your needs. About the order details, please keep reading. 
Double Girder Overhead Crane To Algeria
Double Girder Overhead Crane To Algeria
Double Girder Crane Shippment
Double Girder Crane Shipment

Double Girder Overhead Crane Order Details

 
Item
Double Girder Overhead Crane
Lifting capacity
15/5t
Span
30M
Lifting Height
10 M
Main Lifting speed
0.8/5m/min
Trolley travel speed
2-20m/min
Auxiliary lifting speed
0.8/5m/min
Auxiliary lifting power
6.1/1kw
Crane travel speed
3-30m/min
Lifting power
2.6/16kw
Trolley travel power
2*0.96kw
Crane travel power
2*3kw
Power supply
380V 50HZ 3P
Working Class
M5
Insulation class
F
Protection class
IP54
Control
Ground control+Remote control
Weight
23t

 

What Is A Double Girder Overhead Crane?

 
The double girder overhead crane is a common piece of lifting equipment, suitable for all kinds of heavy goods lifting operations. It mainly consists of bridges, trolleys, metal structures, etc. In addition, our double girder EOT crane has the advantages of compact structures, good performance, low noise, and ease of maintenance and operation. Moreover, double-beam bridge cranes are widely used in indoor and outdoor industrial and mining enterprises, the iron and steel chemical industry, railway traffic, port terminals, logistics turnover departments, and other places. About its price, depends on your specific requirements. If you want to know the crane price, and do not know how to choose a suitable overhead crane type, please send us the lifting capacity, height, span, etc you require. We will send you the price as soon as possible. 
 

 

What is the Difference Between Single and Double Girder Cranes? 

 
Single and double girder cranes are all our hot-selling products. However, they have some differences in the structure, production cost, operation mode, mechanical properties, and application environment. The specific details are as follows: 
  1. Different structure: Generally, single girder overhead cranes have a simpler structure and lighter weight, making them easier to install, maintain, and disassemble. However, double-beam bridge cranes have a more complex structure and are heavier, making installation and daily maintenance more complex.
  2. In terms of production costs, single-beam overhead cranes have the advantage of having shorter spans, consuming fewer construction materials, and being cheaper. Double-beam bridge cranes have larger spans, consume more materials, and have a higher technical content, resulting in higher production costs.
  3. In terms of operation, Single-beam cranes are usually operated on the ground and can be operated manually or remotely. Double-beam cranes require workers to operate them.
  4. From the mechanical performance point of view, single-beam cranes have relatively lower stability and smaller rated lifting capacity, with lower working levels. Double-beam cranes are relatively stable and have larger rated lifting capacities, with higher working levels.
  5. In terms of application environment, single-beam bridge cranes are generally suitable for smaller spans, lighter lifting capacities, and smaller construction site spaces. Instead, double-beam overhead cranes are suitable for larger spans, larger lifting capacities, and larger construction site spaces.
Double Girder Overhead Crane
20 Ton Double Girder Overhead Crane
Single Girder Overhead Crane
Single Girder Overhead Crane

Double Girder Overhead Crane Operating Tips For You 

 

Before Work

  1. Check the brakes, hooks, wire ropes, and safety devices according to the inspection card requirements before starting work. If any abnormalities are found, they should be resolved.
  2. The operator must confirm that no one is on the walkway or track before closing the main power supply. When the power circuit breaker is locked or there is a signboard, it should be removed by the original relevant person before the main power supply can be closed.

During Work

  1. After lifting the load for the first time or when the load reaches its maximum weight per shift, the load should be lowered 0.5 meters above the ground and then re-raised to check the brake performance. After confirming reliability, normal operation can be resumed.
  2. Operations should be carried out by the unified command signal.
  3. If the power suddenly fails during operation, all control lever handles should be placed in the "zero" position. Before resuming operation, the crane's movement should be checked to ensure that it is normal.
  4. It is strictly prohibited to brake and stop the crane's main and small car in reverse gear during normal operation. Before reversing the direction of movement, the handle must be placed in the "zero" position to stop the mechanism completely, and then the reverse operation can be carried out.
  5. For cranes with two hooks, the main and auxiliary hooks must operate separately when switching between them and when the hooks are at similar heights to avoid collisions between the two hooks.
  6. Cranes with two hooks are not allowed to lift two loads at the same time. Adjust the lifting mechanism brake when the crane is not in operation.
  7. It is strictly prohibited to use the limit position limiting device to park and to adjust the lifting mechanism brake while under load.
10 Ton Double Beam Overhead Crane
10 Ton Double Beam Overhead Crane
Overhead Crane Delivery
Overhead Crane Delivery

After Work

  1. Raise the hook to a certain height, park the main car and small car at designated positions, and place the control lever handle in the "zero" position. Pull down the switch handle of the protective box to cut off the power.
  2. Carry out daily maintenance and maintenance.
  3. Complete the handover work.

 

Conclusion

 
We are glad to supply a double girder overhead crane for our Algerian client. At present, the 15-ton double-beam bridge crane has been shipped to Algeria. After receiving the products, if you have any questions, Dejun will solve them for you. 
You Might Also Like