32 Ton Gantry Crane Completed And Sent Out
May 25, 2023
32 ton Gantry Crane Completed And Sent Out
Product Name: Double Girder Gantry Crane
Product Quantity: 1
Lifting weight: 35 tons
The gantry of the double girder gantry crane mainly adopts a box-type double girder welded structure, which increases the working space and facilitates transportation, assembly and disassembly, and later maintenance.
Double-girder gantry cranes are mainly suitable for open-air operations. According to different pick-up devices, they can usually be divided into hooks, grabs, and electromagnetic suckers (lifting electromagnets) or two or more grabbing devices at the same time. It is very common in factories, power stations, warehouses, stockyards and other places.
Product parameters:
|
Lifting weight(t) |
10+10 |
12.5+12.5 |
13.5+13.5 |
|
|
Span(m) |
28.5 |
28.5 |
31.5 |
|
|
Lifting height(m) |
16 |
10 |
13 |
|
|
Speed |
Hoisting |
11.4 |
||
|
Rotation |
0.8r/min |
|||
|
Travelling of crab |
38 |
|||
|
Travelling of trolley |
88 |
|||
|
Working class |
A6 |
A7 |
A7 |
|
|
Electric current |
Three-phase AC 380V 50Hz |
|||
Gantry Crane Daily Maintenance Instructions
The gantry crane is a large-scale lifting machine, and its cost is expensive. In order to effectively use the gantry crane, the gantry crane should be maintained and maintained regularly. The following requirements are required for the maintenance and maintenance of the gantry crane:
1. The steel wire rope shall not be used as the grounding cable during welding;
2. Do not modify any performance characteristics of mechanical and electrical components;
3. Do not modify, reset or tamper with the safety devices;
4. Temporary modifications that are inconsistent with the prescribed descriptions are not allowed;
5. Do not use non-original spare parts or spare parts not recommended by the manufacturer to replace damaged or faulty parts;
6. Do not trust the maintenance of unauthorized personnel or unqualified personnel;
7. Without the prior written consent of the company, no modifications can be made to the equipment;
8. Before any maintenance and maintenance work, the power system must be cut off, and the main switch must be turned to the off position;
9. Mechanical and electrical components should be regularly maintained and repaired. All mechanical and electrical components must be checked regularly to see if there is corrosion, wounds, oil leakage or any other defects;
10. Do not add lubricating oil or grease when the equipment is in motion, and cannot repair or adjust it when the equipment is in motion.