Crane Overhead Bridge

Crane Overhead Bridge

Crane Overhead Bridge A hoist double girder bridge crane is an essential type of overhead crane that is widely used in various manufacturing and industrial facilities for lifting and moving heavy loads from one place to another. It is made up of two parallel horizontal beams called girders,...

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

Description

Crane Overhead Bridge is widely used in various manufacturing and industrial facilities, for lifting heavy objects from one place to another. This type of crane is commonly used in various steel mills, shipyards, and power plants to perform heavy lifting tasks. This product has super strong load-bearing performance, which enables it to lift heavy cargo. The goods will not experience severe shaking during the lifting process, thus ensuring safety. In addition, in order to ensure the safety of operators, we have designed various protective devices, such as anti overspeed devices, safety handrails, etc. This product is powered by electricity, so starting and closing are very simple. We have always regarded customer first as our service philosophy, so we welcome your inquiries.

 

Features
1. The entire crane design is reasonable, therefore it has good stability. The bridge is the main supporting structure, consisting of two parallel beams connected by crossbeams.
2. The use of electric drive makes it more convenient to start and shut down the crane, while also making various operations more convenient.
3. Crane Overhead Bridge is used for lifting and transporting various equipment, and has a great load capacity, so it is often used in various factories.
4. The control device is used to operate the movement of the crane. They are usually located in the control room or cab and can be operated using a remote control or suspended device.

 

China-overhead-cranes-and-hoists

 

China-crane-overhead-bridge

 

Installation Precautions:

 

The installation of a hoist double girder bridge crane requires careful planning, preparation, and execution. The following precautions must be taken during the installation process:

 

1. Site Preparation: The site must be prepared adequately, and the land must be leveled to ensure that the crane can move smoothly without any hindrances.

 

2. Structural Requirements: The structural requirements must be met, and the crane must be installed on a strong and stable foundation. Concrete foundations are usually required to provide the necessary support for the crane.

 

3. Electrical Supply: The electrical supply must be provided to the crane, and an electrician must install the electrical connections to avoid any electrical hazards.

 

4. Crane Assembly: The crane must be assembled according to the manufacturer's specifications, and all the components must be checked for proper alignments and fit.

 

5. Testing and Commissioning: After the installation is complete, the crane must be tested and commissioned to ensure that it is working correctly and meets the standard safety protocols.

 

Double trolley overhead crane

 

Hot Tags: crane overhead bridge, China crane overhead bridge suppliers, manufacturers, factory

You Might Also Like

(0/10)

clearall