Building A Bridge Crane
video
Building A Bridge Crane

Building A Bridge Crane

Building a bridge eot crane with Grab Bucket is a kind of hoisting machinery, which is a kind of machinery for cyclic and intermittent motion. It has automatic weighing and recording functions, the high working level is suitable for the long-term and uninterrupted work of enterprises such as waste incineration power plants.

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

1. Product Introduction:

 

The building a bridge crane with Grab Bucket is with a garbage grab, which is an import equipment in city waste incineration plant. Building a eot crane with Grab Bucket is installed over the garbage pit for garbage charging, transport, mixing and weighing. This Crane can be manual, semi-auto and fully auto type, carrying out automatic grabbing, automatic repeat feeding, automatic repeat dumping, and automatic parking.

 

This Building a bridge eot crane with Grab Bucket belongs to the A5-A8 working class. The rated lifting capacity includes the self-weight of the grab bucket, and the material grabbed by the grab bucket is divided into three types: light, medium and heavy. When used in the open air, with rain-proof equipment and rain-proof equipment, the total weight and wheel pressure of the crane will increase by about 5%.

 

50 ton Eot Crane factory

2. Parameters:

 

Lifting Weight(t)

5

10

16

20

Span(m)

Customized

Max. Lifting Height(m)

20

18

22

26

Hoisting Speed(m/min)

40.1

40.7

41.8

48.6

Travelling Speed of Crab(m/min)

44.6

45.6

43.2

43.2

Travelling Speed of Trolley(m/min)

93.7

86.4

76

89

89

87.3

87.3

Grab (Customized)

Type

Light

Medium

Heavy

Super Heavy

 

Volume(m3)

Customized

 

Density(t/m3)

Customized


3. Component:

 

This machine belongs to the heavy-duty (A6) working system, and the lifting capacity includes the self-weight of the grab. Building a bridge crane with Grab Bucket is composed of box-shaped bridge frame, cart running mechanism, trolley, grab bucket and electrical equipment, all of which are operated in the control room.

 

The Building a bridge eot crane with Grab Bucket's main structure is made of high-quality steel that can withstand the rigors of heavy lifting while maintaining its integrity over time. Additionally, the crane's components are treated with anti-corrosion coatings that protect against rust and other forms of damage.

 

Manual Type:

 

Operator control the bridge eot crane with Grab Bucket with the linkage console.

 

Semi-Auto Type:

 

The grab operation is manual control, and the auto controlled part includes the moving to charging port, weighing and charging.

 

Fully-Auto Type:

 

Once the building a bridge crane with Grab Bucket receiving the charging signal from the charge port, the crane starts to do every move automatically, moving to the garbage, lower the grab, grabbing the waste, lifting the waste, moving to the charging port, weighing, charging, and returning the position. It will repeat the same motion automatically.

 

4. Applicable Environment:

 

Building a eot crane with Grab Bucket is suitable for mechanical processing and assembly workshops, metal structure workshops, mechanical maintenance workshops, metallurgy and foundry workshops and hoisting work in various warehouses, etc. Equipped with grab buckets, eot crane with Grab Bucket is suitable for the handling of ore, limestone, slag, mineral powder, coking coal, sand and other bulk materials in fixed spans indoors or in the open air in metallurgy, cement, chemical and other industrial sectors.

50 ton Eot Crane for sale

5. Wearing Parts:

 

The wearing parts of bridge eot crane with Grab Bucket include Rope guide, Hook safety, Brake and limit switch.

 

6. How to operate a Building a bridge eot crane with Grab Bucket?

 

The building a bridge crane with Grab Bucket has two types of operation on the ground and in the air. Aerial operation refers to cab operation.

 

Grab operation

 

(1) Grab opening operation: lower the lifting and opening and closing to the appropriate position at the same time, stop the lifting and lowering, close and continue to lower, the grab is gradually opened, and the opening and closing operation is completed.

do.

 

(2) Grab closing operation: Open and close the reel for lifting operation, the upper pulley block of the grab bucket does not move, and the lower pulley block moves upward until the grab teeth of the grab cross and touch each other.

The closing action of the grab bucket is completed. During the closing process, the lifting reel is properly lifted so that the lifting wire rope does not sag.

 

(3) Lifting and falling operation of the grab: whether the grab is open or closed, it can be operated to rise or fall. During operation, the lifting and opening and closing of the reel must be at the same time

when.

 

7. Transportation:

50 ton Eot Crane  price

8. Why choose us?

 

Independently conduct over 20 technological flows.

 

We can offer all kinds of OEM/ODM services.

 

Certified by DIN, ISO, BS, CMAA, CE and other major international standards.

 

9. Frequently Asked Questions about Building a bridge eot crane with Grab Bucket:

 

(1) Could we buy spare parts in local once they are out of work?

Of course, our main electrical parts brand is a generic brand; it's very easy to buy all the world. But if there is any difficulty, we can post to you by express, such as DHL, UPS, FEDEX, Aramex, etc.

 

(2) Do you provide lift tools?

Yes, we can provide any kinds of lift tools such as lift sling belt, lift clamp, grab, magnet, pulley blocks, hook, lock catch, wire rope, fiber rope, etc.

 

At building a bridge crane with Grab Bucket, we are committed to providing our customers with the best products and services possible. Contact us today to learn more about our Building a bridge eot crane with Grab Bucket and how we can help meet your lifting needs.

 

Hot Tags: building a bridge crane, China building a bridge crane suppliers, manufacturers, factory

You Might Also Like

(0/10)

clearall