Girder Launcher Crane
video
Girder Launcher Crane

Girder Launcher Crane

This girder launcher crane with european electric hoist is for lifting 1t-1800t stuff. It's very convenient to install in new or existing workshops. This girder launcher crane with european electric hoist is easy to operate with various functions. With the advantages of compact structure, light weight and high lifting height, double girder overhead crane with electric hoist is widely used in workshops, metallurgy, warehouses and assembly shops etc.

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

The girder launcher crane with european electric hoist

 

This girder launcher crane with european electric hoist is for lifting 1t-1800t stuff. It's very convenient to install in new or existing workshops. This girder launcher crane with european electric hoist is easy to operate with various functions. With the advantages of compact structure, light weight and high lifting height, double girder overhead crane with electric hoist is widely used in workshops, metallurgy, warehouses and assembly shops etc.

 

Girder launcher crane with european electric hoist mainly consists of main beam, end carriag  es, walkway, trolley conductor bracket, crab rail, service platform, ladder and handrail etc. components. Crane bridge adopts double beam structure, has enough strength, rigidity and whole stability.

 

30 ton Overhead Crane

2. Component

 

Double-girder bridge crane is mainly composed of bridge frame, trolley operating mechanism, trolley, electrical equipment, etc. According to the frequency of use, it is divided into three working levels: A5, A6 and A7. All movements and controls of the hook bridge crane are completed inside the driver.

 

3. Main Feature of the girder launcher crane with european electric hoist:

 

1.Overhead traveling on the steel structure.normally in workshop.heavy working duty from A5-A8

 

2. Light self weight, could save steel structure cost.

 

3.Lifting and traveling is very accurate.

 

4.VVF/ frequency inverter control, 3-5 speeds to operate, stable to lift and running.

 

5.Six direction action, to make sure the enough wide working area.

 

6.Full safety system as follows:

 

7.Weight overload protection

 

8.Emergency stop system

 

9.Over current protection,Short-circuit protection

 

10.Phase sequence protection

 

11.Zero position protection

 

12.Voltage loss protection

 

13.Limit switch and stopper for crane long traveling and cross traveling

 

14.Lifting over-high and over-low limit switch

 

4. Applicable Environment:
 

Girder launcher crane with european electric hoist is mainly used for transfer, assembly, overhaul and loading and unloading operations in machining workshops, auxiliary workshops of metallurgical plants, warehouses, stock yards, power stations, etc.

 

ton Double Girder Overhead Crane

 

Double-girder cranes are actually what we usually call ordinary cranes. They mainly appear in fixed places such as various machinery manufacturing, assembly, cargo yards, and warehouses, and are used to transport various materials. So next, I will explain to you in detail what you need to pay attention to when installing a double-girder crane in a factory!

 

First of all, sufficient preparations must be made for the installation of the double-girder crane. For example, if you have an industrial factory, you can install the crane first. This will not only use the crane to transport and lift other equipment, but also improve the efficiency of the entire installation process.

 

Secondly, the installation of the track is also very important. The accuracy of the installation must be ensured to avoid rail rolling. Usually, the track installation of lifting equipment is the responsibility of a specialized industrial plant construction team. Therefore, when we install lifting equipment, we must assemble and inspect it in accordance with the track installation specifications to avoid problems.

 

Then, the installation location must be determined accurately. General bridge cranes can be assembled on the ground and then hoisted to the track as a whole using a crane. The specific lifting points should be determined based on the structural characteristics of the crane, including the weight of the bridge body, trolley and driver's cab, and the location of the center of gravity. During overall hoisting, in order to protect the equipment on the trolley from damage, the trolley is generally fixed on both sides of the galvanized steel wire rope and tightly attached to the binding point.

 

Next, the bridge body should enter the site in order and be assembled after the ground is leveled.

 

Finally, when the distance between the double-girder crane exceeds the distance between the columns of the industrial plant, we need to calculate to determine the appropriate lifting method. Some factory buildings may have cranes that are wider than the distance between columns. Whether this kind of crane can carry out overall lifting must be determined through calculation.

 

In addition, if the space on the roof is not large enough, we also need to make calculations to determine a safe construction plan.

Hot Tags: girder launcher crane, China girder launcher crane suppliers, manufacturers, factory