Bridge Crane Festoon System

Bridge Crane Festoon System

The European-style double-beam bridge crane festoon system is one of the most common bridge cranes, also known as EOT cranes. The bridge runs on two parallel, double-end girder runways spanning the gap between the two rail tracks. Driven by electricity, motion control is achieved either in the operating room or through a suspended control device in conjunction with the bridge crane.

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

1. Product Introduction:

 

The Bridge Crane Festoon System consists of a bridge frame, a trolley operating mechanism, a cart operating mechanism and electrical equipment. The overall design of the system adopts a typical structure of traditional layout, and the trolley operating mechanism adopts centralized drive.

 

The pulley block of the lifting mechanism adopts a double pulley block. The heavy object does not move horizontally during the lifting process, the lifting process is smooth, and the installation and replacement of the wire rope are easy. The corresponding winding device uses a single-layer drum, which has the advantages of large contact area with the wire rope and low unit pressure. The hoisting mechanism also involves the selection of wire ropes, reducers, couplings, motors and brakes. The trolley operating mechanism involves calculation of trolley wheel pressure, selection and calculation of trolley wheels, trolley tracks, reducers, couplings, motors and brakes, etc.

 

European Crane factory


3. Component:

 

Bridge Crane Festoon System is widely used to lift goods in workshops, factories, warehouses, stockyards, industrial and mining enterprises, steel and chemical industries, railway transportation, ports and terminals, etc., and is used by many modern enterprises.

 

4. Product Features

 

The space utilization distance will be smaller, which is lower. Using a European-style crane will make the layout of the workshop fully utilize the workshop space and be more reasonable. The distance between the hook and the wall will be smaller, which will make the layout of the workshop more reasonable;

 

The crane is light in weight because it adopts the most advanced domestic technology, so its dead weight is far superior to previous cranes and will save more effective space;

 

The operating equipment of the crane is simpler. It uses a variety of artificially synthesized scientific and technological principles, and its development requires a lot of manpower, saves a lot of time, and the safety factor is also improved a lot. What is more advanced is that some lifting equipment is equipped with a display, which can effectively control the operation through the display, which is both safe and reliable. Now some companies are equipped with wireless remote control devices to control cranes, which provides guarantee for working in difficult environments;

 

After the frequency change of the crane, the efficiency of the crane has been improved. By using advanced technology, the stability of the crane has been greatly improved, and the large swing of the suspended objects has been avoided as much as possible. The safety factor has been improved, and the positioning accuracy of the reproduced objects has also been improved. precise. This type of crane is mainly used for many horizontal lifting tasks that require high accuracy;

 

This type of European crane has low maintenance costs. It should be because it adopts the green and environmentally friendly technology in today's society, so that the power consumption of the crane will be very low during use, and due to its good quality and low power consumption, it will reduce the losses caused by the failure of machine equipment and also reduce A lot of maintenance costs.

 

5. Applicable Environment:

 

Dejun brand bridge crane festoon system are suitable for transfer, assembly, overhaul and loading and unloading operations in machining workshops, auxiliary workshops of metallurgical plants, warehouses, stock yards, power stations, etc.; it can also replace ordinary double-girder overhead cranes for production workshops in light textile industry and food industry. In the case of meeting the same requirements, the height of the workshop can be reduced, the section size of the rail-bearing beam can be reduced, the bearing capacity of the corbel and the pile foundation can be reduced, and the requirements for the rail and the power supply slide line can be reduced.

European Crane for sale

6. Transportation of bridge crane festoon system:

 

Shipping way: by sea, air, land, and Express such as DHL, TNT, UPS, FEDEX. We will choose the suitable shipping method according to your requirements.

European Crane manufacturers

Operating procedures for electric double-girder bridge cranes

 

If you encounter obstacles before driving or while driving, you should sound the alarm;

 

When operating and lifting heavy objects, you should obey the instructions of the full-time command personnel on the ground, but no emergency stop signal is issued by anyone. The operator must stop immediately;

 

Generally, two cranes are not allowed to lift an object at the same time. Special measures should be taken in special circumstances and approved by the equipment manager;

 

When the crane is operating without heavy objects, the hook should be more than 2.5 meters above the ground;

 

It is strictly prohibited for the crane to carry heavy objects over people's heads;

 

When the crane is operating with objects, the point of the heavy objects should be at least 0.5 meters away from the obstacles on the route of the heavy objects;

 

It is strictly forbidden to use hooks to transport or lift people;

 

Tools, spare parts, fasteners, sundries, etc. must be stored in special boxes and are not allowed to be scattered casually on the crane to avoid personal or equipment damage accidents when objects fall;

 

When lifting liquid metal, harmful liquids and important items, regardless of the weight, the heavy object must first be slightly lifted 150-200 mm off the ground. After verifying the reliability of the brake, resume normal lifting work;

 

When the open-air crane is not working, you must try to secure the crane reliably (for example, hang the hook on the ground anchor, plug the inclined iron at the wheel, etc.) to prevent the crane from being blown away by the wind and causing an accident;

 

The operator must ensure to prevent collision with another crane. When one crane fails, another adjacent crane can be used to push this crane. In this case, the two cranes must be unloaded. And move at a slow pace;

 

When lifting heavy objects and lowering the spreader, the operator is not allowed to leave the control room;

 

When the crane is finished working, the spreader should be raised to the upper position, that is, the extreme position;

 

Inspection and maintenance are not allowed while the crane is in operation.

Hot Tags: bridge crane festoon system, China bridge crane festoon system suppliers, manufacturers, factory

You Might Also Like

(0/10)

clearall